The Hari Post

Monday, June 27, 2005

MBF : Mech Engineers on Urgent Operation

The Condition of MBF which was aling over some time got detoriated. It got into flames once again. Small amount of Hot Fines also started to spill out from the mis-alignment. All the mechanical engineers, welders, technicians working on other jobs were summoned at Mod # 4 MBF . Reforming[Producing high temperature gas for reduction reaction at Furnce", was stopped and furnace was purged with seal gas for some time. Then system was depressurised and the operation of MBF shaft for proper alignment were under progress when the B-Shift end reports came in.

0 Comments:

Post a Comment

<< Home